Preliminary Programme Overview
| Thursday, 22.09.2005 |
| 08.30 Uhr |
Departure from Manchester Conference Centre |
| 09.30 Uhr |
ENERG Combined Power Ltd, production facility of cogeneration units for heat and power supply from biogas, manufacturing ranging from 33kW up to 1.5MW and on site test facility in Manchester,
Drive to Ludlow - Over night at Hotel in Ludlow |
| 08.30 Uhr |
Ryegrass digesting pilot plant and crop growing area at Greenfinch Ltd. pilot site and equipment assembly at Greenfinch company site in Ludlow, Shropshire |
| 11.00 Uhr |
Drive to Holsworthy |
| 15.00 Uhr |
Centralized biogas plant with farmers participation for processing food wastes with agricultural wastes, 2,1 MW electrical capacity, in Holsworthy, Devon
Over night at Hotel in Horsington |
| 09.00 Uhr |
Introduction to Organic Power Ltd. at the company site, innovative digester developer, planner, manufacturer and equipment manufacturer for biogas plants in Horsington, Summerset
Visit of digester site, manufacturing facility and biogas filling station at Organic Power Ltd., Horsington, Summerset |
| 15.00 Uhr |
"Portagester" Biogas pilot plant for solid manure and waste for fertilizer and biogas production in Stockbridge, Hampshire
Over night at Hotel in Stockbridge |
|
End of study tour in London |
|
 |